Hello,
I think the "Synchronize Control Map" (VI Pro) is a new feature, and it's very useful, but I noticed that there is probably a bug. When I change a parameter in a VI Pro instance inside VE Pro, all of my VI Pro instances are synchronized, even if this "new" feature is unchecked.
Does somebody have the same issue? Thanks.