I am baffled to what is going on here with the latest version of VE PRO 7. I have many machines with a lot of experience. The ne machines can run Cubase as expected....but running VE PRO yields terrible results. The text below is what I sent support. If anyone has any thoughts please share.....
Thanks
Super frustrated.....I upgraded am Intel 5960x (8 core) with a very large orchestral template that ran at 50% CPU. I upgraded to a machine (9900k) I was using for about a year running Cubase. Now that machine should be at least 30% faster...but it is not it is running terrible with a idle load of 82%. I thought maybe there was some component causing an issue....so I built a whole new machine based on the 8 core RYZEN 3700x which is similar in benchmarks as the 9900k processer. It is running it just as bad with 82% load. Please advise. I have a 14 core Intel that also works beautifully. I can not figure after wasting 3 full days now why a 5960x machine works so much better. I have a very large template and I tested much smaller 16 instances of each plugin, i.e., Kontakt, Omnisphere, etc... With a small setup/template the new machines perform as expected and better than the older 5950x. It is only when he template gets large that the effect of poor performance becomes more exaggerated. I hope you can help solve this.